🏗️ Phase 1: The Foundation (Environment & Setup)
Before touching a schedule, you must understand where it lives.
Module 1: Navigation & Structure
- Understanding the EPS (Enterprise Project Structure) vs. the WBS (Work Breakdown Structure).
- Navigating the Layout: Customizing Columns, Gantt Charts, and Toolbars.
- The OBS: Connecting organizational responsibility to project nodes.
Module 2: Project Architecture
- Creating a New Project: Settings for "Planned Start" and "Must Finish By" dates.
- Calendars: Creating Global vs. Project-level calendars. Mastering "Work Periods" (8-hr days vs. 10-hr shifts).
- Activity Coding: Using Codes vs. UDFs (User Defined Fields) for grouping and sorting.
🛠️ Phase 2: Building the Logic (Planning & Scheduling)
The core of the Critical Path Method (CPM).
Module 3: Defining Activities
- Activity Types: Task Dependent, Resource Dependent, and Milestones (Start vs. Finish).
The "Step" Function: Breaking down large tasks without inflating the activity count.
Module 4: Relationship Logic
- The Four Link Types: FS, SS, FF, and SF (when to use them and when to avoid them).
- Lags and Leads: Why excessive Lag is a "Scheduling Sin."
Identifying the Critical Path: Longest Path vs. Total Float methods.
Module 5: Constraints
- Hard vs. Soft Constraints (Must Start On vs. As Soon As Possible).
- The danger of "Negative Float" created by artificial constraints.
👥 Phase 3: Resource & Cost Integration
Adding "Weight" to the schedule.
Module 6: Resource Management
- Labor, Non-Labor, and Material resources.
- Duration Types: Choosing between Fixed Units, Fixed Duration, or Fixed Units/Time.
Resource Leveling: Balancing the workload without slipping the finish date.
Module 7: Cost Loading
- Assigning Expenses vs. Resource Costs.
- Understanding Price per Unit and Budgeted Total Cost.
📊 Phase 4: Execution & Maintenance
Turning a plan into a living document.
Module 8: The Baseline
- Capturing the "Contractual Snapshot."
Maintaining vs. Restoring Baselines.
Module 9: Updating Progress
- Setting the Data Date.
- Actual Starts/Finishes and Remaining Duration.
- "Out-of-Sequence" Progress: How to handle work that skips the logic.
Module 10: Reporting & Analytics
- Variance Reports: Comparing BL Finish vs. Current Finish.
- Exporting to Excel (XER vs. XML).
- Using P6 Visualizer for high-level TSLD (Timescaled Logic Diagrams).
🔎 Phase 5: Advanced Forensic Analysis
The "Focal Point" Professional Level.
Module 11: Schedule Health Checks
- The DCMA 14-Point Assessment: Identifying logic gaps and high-duration activities.
Module 12: Time Impact Analysis (TIA)
- Fragnets: Modeling a delay to prove an Extension of Time (EOT).
Module 13: Global Change
- Writing "If/Then" scripts to bulk-edit thousands of activities at once.